Cold-weather concrete site with curing blankets and workers checking the pour
Knowledge

Cold-weather concreting with maturity control

At low temperatures, strength development slows down. ConReg 806 helps site teams follow temperature history, maturity, and the effect of insulation or heating.

What teams need to see early

  • Measuring points that are colder than the rest of the structure
  • Whether insulation and heating are having the intended effect
  • When concrete approaches the target for the next work step
  • Which temperature history should be saved for documentation

ConReg in the workflow

Type-T thermocouple wire is placed at critical points before the pour. ConReg 806 reads temperature and maturity so the team can act before low temperature becomes a quality or schedule problem.

Buy or rent ConReg 806 Request pricing